Smolensky Greenhouse Facility LLC

Construction of Smolensky Greenhouse Facility LLC in Roslavl (Roslavl District)

Project delivery time: 2017-2024

Total investment in the project amounting to approximately 3.14 bln. roubles.

Social effect – creation of 300 jobs.

According to the project, a modern greenhouse facility will be located within the territory of 42.6 ha with a developed engineering and related infrastructure for growing cucumbers and lettuce (the total area of greenhouses will exceed 17 ha). The production capacity will amount to 22 thousand tons of cucumbers per year with the forecasted crop yield of 140 kg/m2.

The investment project is to be implemented in two stages: Stage 1 – construction and putting into operation phase one of the industrial area of 8.2 ha equipped with the needed engineering and technical equipment and utilities in 2018; Stage 2 – construction and putting into operation phase two of the industrial area of 9 ha in 2019 and reaching 17.2 ha once the plant is fully operational.

For the moment metal frameworks of the greenhouses are installed at the production site, the greenhouses are almost fully glazed, mounting works related to the heating systems installation are started. The supply of equipment and interior works at the greenhouses are scheduled for a month later. This project will also imply construction of 20 block of flats 3 apartments in each for the plant employees (5 of them are already built).

The project implementation will provide the population of the Smolensk region and neighbouring regions with high-quality and environmentally safe vegetable products and will contribute to ensuring import substitution and increasing the food security indicators.

You watch a project

Smolensky Greenhouse Facility LLC